Polokego Makgakge • over 3 years ago
Extension - due to loadshedding stage 6 (South africa power outage)
Hi
I'm writing 2 enquire if Its possible 2 have an extension
Because we are dealing with stage 6 loadshedding in my country
Loadshedding: An event were specifiic areas of the countries national grid is turned off 4 half the day.
https://www.da.org.za/2023/01/da-urges-south-africans-to-take-to-the-streets-against-ancs-stage-6-load-shedding-and-electricity-price-hikes
Comments are closed.

0 comments